Project Context

Market: Africa. Application: Factories. Recommended power: 100-1000 kVA standby or prime power.

Challenge

Pump motors and control systems needed stable power during outages.

Recommended Solution

The review collected pump data, starting method, cable route, outdoor placement and maintenance requirements.

قائمة التحقق

  • Open or silent set
  • ATS
  • Motor starting review
  • Outdoor installation
  • Spare kit
  • Collect pump data
  • Review starting current
  • Plan cable route
  • Protect from rain
  • Stock filters
  • Pump load clarified
  • Installation path prepared
  • Voltage requirement checked
  • Service parts listed