6 min read
At 250 hours, service work usually includes filters, oil, belts, battery terminals, coolant concentration and control panel checks.
The service interval should be shortened in hot, dusty, humid or high-load environments.
Always inspect the generator under load after maintenance. No-load testing alone may miss cooling or fuel delivery issues.
Lista de verificación
- Replace filters
- Check coolant
- Clean radiator
- Inspect battery
- Load test after service